Essential Design Features Of Benching For Model Train Layouts

A good solid platform that is going to support a ModelNow the track can be installed. Because there is an
Railroaders layout is essential. In this article we shallempty space it is easier to get it right first time with
explore in detail what are the main components ofany track detailing such as turn-ins and turn-outs, cross
benchwork and the essential elements of design.overs, turntables and sidings. The wiring can be
There is great comfort in doing it right first time.finalised and controllers installed.
The part of the benchwork that is rarely seen or evenThis is where the fun starts because the locomotives
considered by the visitor to your layout is theand rolling stock can be installed and tested, here the
beam-work, or under structure. This should consist ofcontrollers and the wiring get tested at the same time
vertical, cross and diagonal bracing.of course. This may well be a substantial layout and
The verticals are obviously the legs and ideally will bebefore any scenery or accessories are positioned
fixed to the floor and to the top. The cross bracing areaccess has be assured where it is not possible to
the runners that ensure the legs are always in parallelreach from the control center. It is really difficult to put
with each other and should be fixed to the top and toscenery onto areas that are normally out of reach. If
each leg about 7-9 inches from the floor. Eachthe benching is strong enough though to take the
diagonal brace absolutely has to be fixed to a leg andweight of the modeller, no problem.
a cross brace. Never from leg to leg or cross brace toMany modellers paint the bench top before anything is
cross brace. This is critical to ensure stability.installed as this gives them a base from which to add
The platform or top surface should be at least halftheir scenery. A shade of a neutral green or brown is
inch plywood or flooring grade chipboard or MDF. Youcommon. It all sounds easy doesn't it? Well it actually is
will notice that these three materials are looselybecause what is described here is the carrying out of
described as particle or laminate board, this is essentiala plan. If the benchwork and initial installation is well
for the dimensional stability that the track requires.thought out and designed it is easy and also quite quick
Before anything else the benchwork has to be theto do.
finished article before any track is laid or scenerySo if you are considering building a new benchwork
installed. All sharp edges rounded off, joins smoothedinstallation all you have to do is draw it, size it, design
out and glued if possible and the control station defined.the under structure, cut everything to size and install it.
Also, now is a good time to drill the platform to runWhether a simple or complex benchwork installation
electrical wiring underneath the top to keep it all tidythe rules are exactly the same.
and out of sight.